4 Room Standard BTO Package

5.) STANDARD BTO 4 ROOM PACKAGE *$19,888

PROFESSIONAL SERVICES
  • Design consultation & Space planning
  • Design proposal & 3D perspective drawings
  • Selection of color, material & accessories
  • Site co-ordination & Supervision
  • Decoration advice
MASONRY WORKS
  • 1. Supply and Lay selected 600mmx600mm Homogenous Tiles for Living, Dining area and Passage way files Up To $3 Per Square Feet Max)
  • 2. Supply and Install HDF Laminate Flooring c/w Skirting for all Bedrooms
  • 3. Construction Of Main Entrance Kerb
  • 4. Construction Of 50mm Height Cabinet Base With Side Tiling Finish
  • 5. Construction Of 50mm Height Washing Machine Base With Full Tiling Finish
  • 6. Construction Of Fridge Base With Full Tiling Finish
  • 7. Construction Shower Kerb At Bathrooms
PLUMBING WORKS
  • 1. Provide Labour to install Storage Water Heater (Accessories by owner)
  • 2. Provide Labour To Install Kitchen Sink And Tap (Accessories By Owner)
  • 3. Provide Labour And Material To Connect Inlet/Outlet Pipe In Kitchen
  • 4. Provide Labour To Install Bathroom Accessories Set For 2 Bathrooms (Accessories By Owner)
CARPENTRY WORKS (USING SOLID PLYWOOD IN SELECTED HIGH PRESSURE LAMINATE FINISHING WITH INTERNAL WHITE PVC FINISHING)
  • 1. l. Design, Fabricate And Install 10ft Top Hung Kitchen Cabinet c/w Abs Trimmed Casement Doors
  • 2. Design. Fabricate and Install 10ft Bottom Kitchen Cabinet c/w Abs-Trimmed Casement Doors Kitchen Cabinet c/w: 10ft Any selection of solid surface Counter Top 2 Tier Stainless Steel Dish Rack 1 no. Aluminum Frame Frosted Glass Panel Anti Slam Hinges for All Doors nos. Soft Closing Track for Drawers PVC Cutlery tray
  • 3. Provide Labor to Install Hob and Hood (Accessories Provided By Owner)
  • 4. Design, Fabricate And Install 6ft Full Height Built-in Solid Plywood Casement Wardrobe c/w Abs-Trimmed Casement Doors Wardrobe c/w: hanging Rods internal Drawers & Shelving Anti Slam Hinges For All Doors 3 nos. Soft Close Track For Drawers
CEILING WORKS
  • 1. Supply Box Light Holder At Living/Dining Area
  • 2. Supply False Ceiling At Main Entrance And Passage Way Leading To Bedroom
WINDOW WORKS
  • 1. Supply and Install 3-Way Aluminum Sliding Window At Service Yard
GLASS WORKS
  • 1. Supply And install 2 sets Frameless 10mm Thick Clear Tempered Glass shower screen For Both Bathrooms
PAINTING WORKS
  • 1. Painting of Internal walls of the whole House with Nippon Paint Vinilex 5000 (4 Choices of Colors)
  • 2. Painting of Internal Ceiling With Nippon Paint Matex (White)
WHOLE HOUSE AND GENERAL
  • 1. Provide Protection Sheet After Completion of Flooring
  • 2. Supply Labour To Clear Renovation Debris
  • 3. Supply Post Renovation General Cleaning for Whole Unit

WhatsApp chat